PROJECTS
Logistics
Bijie District Tobacco Leaf Logistics Center
Location:BijieTime:2007
Total land area of design: 389,925 square meters; floor area: 243,040 square meters.
CNOOC Huizhou Logistics
Location:HuizhouTime:2011
Location: inside Daya Bay Petroleum and Chemical Industrial Zone; total land area of design: 162,674 square meters; net land area: 158,718 square meters; floor area: 15,272.45 square meters.
Bijie District Tobacco Leaf Logistics Center
Location:BijieTime:2007
Total land area of design: 389,925 square meters; floor area: 243,040 square meters.
CNOOC Huizhou Logistics
Location:HuizhouTime:2011
Location: inside Daya Bay Petroleum and Chemical Industrial Zone; total land area of design: 162,674 square meters; net land area: 158,718 square meters; floor area: 15,272.45 square meters.
Bailan Park Warehouse Project of Guangzhou Maritime Transport (Group) Co., Ltd.
Location:GuangzhouTime:2008
A sino investment project; a transfer logistics center; total land area: 25,000m2; floor area: 15,000m2; designed in 2008 and completed in 2009.
ProLogis GuangZhou Bonded Development Co.,Ltd.
Location:GuangzhouTime:2008
30,746 square meters, total construction area of 28,231 square meters.
Bailan Park Warehouse Project of Guangzhou Maritime Transport (Group) Co., Ltd.
Location:GuangzhouTime:2008
A sino investment project; a transfer logistics center; total land area: 25,000m2; floor area: 15,000m2; designed in 2008 and completed in 2009.
ProLogis GuangZhou Bonded Development Co.,Ltd.
Location:GuangzhouTime:2008
30,746 square meters, total construction area of 28,231 square meters.
P.G.Logistics(TianJin) Co.,Ltd.
Location:TianjinTime:2008
Invested by Baogong Logistics Froup; a transfer logistics center; total land area: 55,000m2; floor area: 55,000m2
P.G.Logistics(NanJing) Co.,Ltd.
Location:NanjingTime:2006
Baogong Logistics Group is Chinese largest, most influential and e most leading third-party logistics enterprises. Baogong base of Shenyang covers an area is 260,000 square meter with a total construction area of 230,000 square meter. All the warehouse are the overhead and large space stores which adoptes the advanced fire control technology with a fire district area is three times 华体体育-官方网站入口 than the average large warehouse.
P.G.Logistics(TianJin) Co.,Ltd.
Location:TianjinTime:2008
Invested by Baogong Logistics Froup; a transfer logistics center; total land area: 55,000m2; floor area: 55,000m2
P.G.Logistics(NanJing) Co.,Ltd.
Location:NanjingTime:2006
Baogong Logistics Group is Chinese largest, most influential and e most leading third-party logistics enterprises. Baogong base of Shenyang covers an area is 260,000 square meter with a total construction area of 230,000 square meter. All the warehouse are the overhead and large space stores which adoptes the advanced fire control technology with a fire district area is three times 华体体育-官方网站入口 than the average large warehouse.
P.G.Logistics(ShenYang) Co.,Ltd.
Location:ShenyangTime:2005
Baogong Logistics Group is Chinese largest, most influential and e most leading third-party logistics enterprises. Baogong base of Shenyang covers an area is 236,000 square meter with a total construction area of 190,000 square meter. All the warehouse are the overhead and large space stores which adoptes the advanced fire control technology with a fire district area is three times 华体体育-官方网站入口 than the average large warehouse.
P.G.Logistics(Suzhou) Co.,Ltd.
Location:SuzhouTime:2002
Invested by Baogong Logistics Froup; a transfer logistics center; total land area: 76,600m2; floor area: 42,000m2
P.G.Logistics(ShenYang) Co.,Ltd.
Location:ShenyangTime:2005
Baogong Logistics Group is Chinese largest, most influential and e most leading third-party logistics enterprises. Baogong base of Shenyang covers an area is 236,000 square meter with a total construction area of 190,000 square meter. All the warehouse are the overhead and large space stores which adoptes the advanced fire control technology with a fire district area is three times 华体体育-官方网站入口 than the average large warehouse.