Good News! GDE Successfully Won the Bid for Changji Domestic Waste Incineration Power Generation EPC Project Edit Date:2022/03/11
Recently, the company with outstanding performance, strong technology, especially the comprehensive strength and leading position in waste-to-energy area of environmental industry, successfully won Chengfa Environmental Protection Energy (Changji) Co., LTD. Changji domestic waste incineration power generation EPC project with rank 1 in total score.
It was reported that the project was located 1.8km to the north of Hexie Er Village, Miaergou town, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, and 40km to the north of Changji City. It is planned to build a 600t/d mechanical waste incinerator, equipped with a waste heat boiler generating 4.0MPa, 400℃ steam, a 12MW condensing turbine and a 15MW generator. After the completion, it can process 600 tons of garbage per day, with an annual capacity of 219,000 tons and generate 84.76 million kWh power annually.
This project is the company’s second domestic waste incineration EPC project in Xinjiang after Kashgar project, which will lay a solid foundation to develop the western market, even to radiate the Central Asia and European market with its unique geographical advantages. As a livelihood project attracting much attention from governments at all levels and the public, the company will always adhere to the core Concept of “Respect, Pragmatism, Green, Innovation, Excellence”, commit to properly perform project construction, response to the society and customers with excellent technology and service, and create 华体体育-官方网站入口 high-quality projects.